Temporary footpath closure: Footpath crossing the tramway adjacent to the Quays Loop Road, Salford Quays Order 2009
Notice is hereby given that the council of the city of Salford intend in not less than seven days to make an order the effect of which will be to introduce temporarily a footpath closure as per the schedule below.
The order is required to enable construction of the new spur from the existing tramway to provide a service to the new Media City Development and will commence on Monday 8 June 2009 for a period of six months until 8 December 2009. Diversions will be signed locally.
Plans showing the areas affected by the proposed order may be inspected at the Legal Section, Salford Civic Centre, Chorley Road, Swinton, Salford, M27 5DA during normal office hours. (Ref H/CW/UV/RTT/293).
Schedule
- Footpath crossing the tramway adjacent to The Quays Loop Road, Salford Quays.
4 June 2009
Barbara Spicer
Chief Executive
Salford Civic Centre
Chorley Road
Swinton
Salford
M27 5DA
Downloadable documents
If you are unable to view documents of these types, our downloads page provides links to viewing software.
This page was last updated on 3 October 2009